← Portfolio

4D SCHEDULE DEMONSTRATIONS · LOD 350 · CPM-LINKED

4D Model Gallery

Demonstration models, three per sector, each built from the type of work in my portfolio. Every element is linked to an activity in its CPM baseline, so the model is built by the schedule as the data date moves.

—

—

CPM BASELINE · FS LOGIC · 5-DAY CALENDARRed bars are on the critical path (total float 0). The dashed line is the data date.