AHMED HOSSAM

Planning Engineer · CPM Scheduler · Project Controls

Ahmed Hossam

I build Primavera P6 schedules that hold up: through government review, through monthly updates, and through delay disputes. I'm a Senior Planning Engineer with 7+ years in construction, nearly 4 of them in planning and project controls, working remotely from Cairo for U.S. contractors on government and private-sector projects.

I have supported 72 projects across federal facilities, hospitals, schools, water plants, highways, data centers and residential buildings. From March 2025 to September 2026 I was also Project Control Engineer on two large mixed-use developments in Egypt, valued at EGP 5B and EGP 40B.

What you get: baselines built to your contract specification, weekly or monthly updates with narratives, DCMA 14-point health checks, cost and resource loading with SPI/CPI reporting, and time impact analysis when delays hit.

Primavera P6MS ProjectUFGS 01 32 17 / 01 32 01SDEFTIASynchro 4DCost & resource loadingPower BI
CAREER PROGRAMME · 2019 TO DATA DATE

Education and work experience

EducationPlanning & controlsSite & technical
PORTFOLIO PROGRAMME · ALL PROJECTS

Every project on this site, drawn as one P6 bar chart

Swipe sideways to see the whole timeline →

Each bar is one project's schedule window from its P6 file, packed into lanes by sector. The solid part shows calendar time elapsed to the data date, not percent complete or earned progress. Select a bar to open that project's construction sequence.

WBS 1.0

Project types

U.S. federal, healthcare, education, water, highway, data center and residential work, plus two U.K. data center packages and two large mixed-use developments in Egypt. Named by type and scope only.

WBS 2.0

Construction sequences

For each project: the scope, the order of construction taken from its schedule WBS, and what I delivered.

WBS 3.0

Delay analysis

How I prepare a time impact analysis (TIA), the same way on every job.

A3010

Last accepted update

Start from the update accepted just before the event. The baseline is too old to show the real path.

A3020

Read the record

RFIs, notices, directives, bulletins, daily reports and dates of the events.

A3030

Build the fragnet

Model the event as new activities tied only to the work it actually affected.

A3040

Recalculate

Pre- and post-impact runs at the same data date; compare completion and milestones.

A3050

Report

Days of impact, the critical path before and after, and the narrative reviewers need.

WBS 4.0

Services

Remote, in Primavera P6 (XER) or Microsoft Project (MPP/XML), to the contract specification when there is one.

SV-01

Baseline schedules

IPS / NAS / BPS built from the drawings, specifications, SOV and contract milestones: WBS by area and system, procurement chains, calendars, cost or resource loading, SDEF.

Delivered: XER/MPP, narrative, critical-path and SVC layouts

SV-02

Updates & narratives

Weekly, bi-weekly or monthly updates with actuals, critical and longest path, float trends, lookaheads, S-curves and pay applications.

Delivered: updated schedule, narrative, 2 to 8-week lookahead

SV-03

Delay analysis & TIA

Pre/post-impact fragnets, waterfall logic reports, and resubmissions in reply to reviewer comments.

Delivered: impacted schedule, TIA report

SV-04

Reviews & health checks

Independent baseline and update assessments, compliance reviews against the spec, comment resolution, and reviews of GC schedules against a trade subcontractor's scope.

Delivered: findings by activity ID, response matrix

SV-05

Cost, crews & manpower

SOV/CLIN cost loading, man-hour and crew loading, ramp-up plans, concurrency histograms and cash-flow forecasts.

Delivered: loaded schedule, curves and histograms

SV-06

Conversion & dashboards

MS Project to P6 conversion and back, activity-ID mapping for Power BI, and interactive HTML progress dashboards.

Delivered: clean XER, change log, dashboard

WBS 5.0

Project register

Every project, with its project code, region, client type, schedule size and what I delivered. Select a row to see its sequence.

CodeProject typeRegionClient typeActivitiesDeliverables
WBS 6.0

From contract to accepted baseline

The order I build a baseline in. Each step depends on the one before it.

A6010 → A6020

Read the contract

Scheduling spec (for example 01 32 16, 01 32 17, 01 32 01), milestones, calendars, weather days, reporting format and loading rules.

A6020 → A6030

Break down the work

WBS by phase, building, level, area or bid item, so progress can be measured where the crews work.

A6030 → A6040

Plan procurement

Submit, review, approve, fabricate and deliver for every long-lead item. On many jobs this chain is the critical path.

A6040 → A6050

Tie the logic

Every activity gets a predecessor and a successor. Lags become activities. Constraints are used only where the contract requires them.

A6050 → A6060

Load cost and resources

SOV, CLIN or bid-item cost, and crews or man-hours, so the schedule produces S-curves, pay applications and manpower curves.

A6060

Check and issue

A health check, a read of the critical path, then the narrative and layouts the reviewer asks for.

WBS 7.0

Tools

Oracle Primavera P6XER
Microsoft ProjectMPP / XML
SDEF exportFederal
ExcelSOV · Templates
Power BICoding
HTML dashboardsWeb
Synchro 4D4D simulation
3D / 4D viewsVisual
NarrativesWord / PDF

NEXT ACTIVITY · SUCCESSOR TO YOUR PROJECT

Your baseline is due. Let's start it.

Baselines, updates and delay analysis in Primavera P6 or MS Project. Send me the specification, drawings or your current schedule, and I'll get back to you with how I would approach it.

WORKING HOURS

Saturday to Thursday
9:00 am to 2:00 pm, Cairo time

WORK MODE

Remote or hybrid

ENGAGEMENT

Freelance or under contract

CONFIDENTIALITY

Ready to sign an NDA. Client and project names outside Egypt are withheld on this site for that reason.